Onehunga Cycle and Walkway Stage 2

As main contractor, TSL project managed traffic control, health & safety, environmental protection and construction of road widening and footpath reconstruction that included: tree removal and trimming, sediment control, excavation, street drainage, water main relocation, street lights relocation, kerb and channel, pavement construction (basecourse, chip seal, line marking), signs, footpath, pram crossings & vehicle crossings, topsoil and grass and tree planting. Work was located on a Level 2 road that took all motorway off ramp traffic. Footpath work required provision of safe temporary pedestrian travel through the worksite. Excellent traffic control resulted in no incidents or accidents.

TSL achieved a very high quality standard, had no repeat work and delivered the project on time despite a very short contract period – through providing adequate resources in a timely manner.

Relevance: Demonstates TSl ability to deliver road works on time to a high quality standard with excellent QA, EH&S performance and stakeholder communications.

Web development by Jaijaz